Apply OSHA power-line clearance rules when transporting and operating a drilling rig mast
domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗
Steps
Survey the site for overhead power lines before rigging up or raising the mast
Determine line voltage (contact the utility if unknown) to identify which clearance option under 29 CFR 1926.1408 applies
Maintain minimum clearance for the mast, boom, and any part of the equipment or load (10 feet for lines at or below 50kV under one compliance option, or the greater distance specified in Table A for higher voltages)
Post a dedicated spotter when work must occur near the clearance boundary
Treat rain, fog, or dust as reducing effective safe distance and increase clearance accordingly
Known gotchas
29 CFR 1926.1408 clearance options apply to construction equipment operations; general industry work is separately governed under Part 1910, so confirm which standard applies to the job
Clearance requirements cover the load and rigging, not just the physical mast tip
Utility line de-energization or spotter assignment should be arranged before rig-up, not decided improvisationally in the field
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?