Maintain OSHA-required clearance between a scaffold and overhead power lines

domain: construction-safety.osha-scaffolding · 6 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Identify whether nearby lines are insulated or uninsulated, and their voltage.
  2. Maintain at least 3 feet of clearance from insulated lines under 300 volts.
  3. Maintain at least 10 feet of clearance from uninsulated lines, or insulated lines at or above 300 volts.
  4. If work requires closer proximity, notify the utility/electrical system operator and arrange for de-energization, line relocation, or protective coverings before proceeding.
  5. Apply the clearance rule to the scaffold structure itself and to any conductive material or equipment handled from it, not just to workers.
  6. Re-verify clearance any time the scaffold is erected, altered, or moved, since geometry changes as it goes up.

Known gotchas

Related routes

Maintain OSHA-required minimum clearance distances between a scaffold and nearby power lines under 1926.451(f)(6)
osha.gov · 5 steps · unrated
Provide OSHA-compliant access to and between scaffold platforms
construction-safety.osha-scaffolding · 6 steps · unrated
Ensure scaffold erection, moving, dismantling, or alteration is properly supervised per OSHA requirements
construction-safety.osha-scaffolding · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans