Confirm the OSHA 1926.850 engineering survey is completed and documented before starting demolition operations

domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Read 29 CFR 1926.850(a): before permitting employees to start demolition, a competent person must perform an engineering survey of the structure covering framing, floors, walls, and potential for unplanned collapse
  2. Extend the survey to any adjacent structure where employees could be exposed to hazards from the demolition
  3. Obtain and retain written evidence that the survey was performed — OSHA requires the employer to document the survey, not just perform it verbally
  4. Use the survey findings to determine the safe sequence of demolition operations, including utility disconnects and any known hazardous locations, before work begins
  5. Reference OSHA's Demolition standards page and Technical Manual Section V Chapter 1 for interpretation guidance on borderline cases (e.g., partial-structure demolition, unknown construction type)

Known gotchas

Related routes

Plan Safe High-Reach Excavator Demolition Operations
osha.gov · 5 steps · unrated
Verify Utility Disconnects Before Starting Structural Demolition
osha.gov · 5 steps · unrated
Verify Crane/Attachment Operator Certification for Demolition Work
osha.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans