Plan Safe High-Reach Excavator Demolition Operations

domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Verify the high-reach excavator's ground bearing surface is level, firm, and free of soft soil, mud, or slope before positioning the machine, since these machines typically lack stabilizing outriggers and are top-heavy when extended.
  2. Confirm floor/slab load capacity before operating on any elevated structure, verifying it can support the equipment's weight plus accumulated debris per 29 CFR 1926.856(a).
  3. Establish and enforce an exclusion/drop zone around the work radius, keeping ground personnel out of the fall area, and brief the crew on the operator's blind spots.
  4. Assign an operator with documented experience on hydraulic demolition attachments (crushers, shears, high-reach booms), and complete a task-specific evaluation for the equipment and attachment in use.
  5. Sequence demolition top-down consistent with the engineering survey, avoiding undermining or overloading sections of structure the machine or personnel still depend on for support.

Known gotchas

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans