Comply with OSHA Chute (1926.852) and Wall Stability (1926.854) Rules

domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. For material chutes angled more than 45° from horizontal, fully enclose the chute except for loading openings at/near floor level, and keep openings closed at stories below the top floor when not in use.
  2. Install a substantial gate near the chute's discharge end and assign a competent employee to control it and manage truck loading/backing at the discharge point.
  3. Secure the discharge area when the chute is not in active use, and protect any chute opening where workers dump debris with a guardrail approximately 42 inches above the standing surface.
  4. For wall/masonry removal, ensure no wall section taller than one story is left standing without lateral bracing unless it was originally designed to be self-supporting and confirmed structurally safe.
  5. Leave all walls in a stable condition at the end of every shift, and solidly plank floor openings within 10 feet of a wall being demolished unless employees are excluded from the area below, per 1926.854.

Known gotchas

Related routes

Comply with OSHA's structural steel assembly and metal decking hole/opening rules under 1926.754 during deck installation
osha.gov · 5 steps · unrated
Apply OSHA trench spoil-setback and ladder-egress requirements (29 CFR 1926.651)
osha.gov · 5 steps · unrated
Determine whether a high-rise window-cleaning descent job must be handled as an OSHA 1910.27(b) rope descent system or falls instead under 1910.66 powered-platform (BMU) rules
osha-1910-27-vs-1910-66-classification · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans