Apply OSHA trench spoil-setback and ladder-egress requirements (29 CFR 1926.651)

domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the current text of 1926.651 via eCFR/OSHA before citing it — this section covers general excavation requirements, separate from the soil-classification appendix.
  2. Apply the spoil/excavated-material placement rule requiring materials be kept at least 2 feet from the edge of the excavation to prevent them falling or rolling into the trench.
  3. Provide a stairway, ladder, ramp, or other safe means of egress in trench excavations 4 feet or deeper, positioned so no employee must travel more than 25 feet laterally to reach it.
  4. Verify egress devices extend to within reach of employees and remain in place throughout the shift — do not remove a ladder mid-task without providing an alternate means, per OSHA interpretation letters.
  5. Document the competent person's daily inspection covering spoil placement and egress access alongside the required cave-in/atmospheric inspections.

Known gotchas

Related routes

Comply with OSHA Chute (1926.852) and Wall Stability (1926.854) Rules
osha.gov · 5 steps · unrated
Look up OSHA's general scaffold fall-protection and guardrail thresholds under 29 CFR 1926.451 for a specific platform height.
osha.gov · 5 steps · unrated
Classify trench soil per OSHA 1926 Subpart P (Type A/B/C) before selecting a protective system
osha.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans