Determine when high winds require adjusting or suspending crane operations during steel erection under 1926.1417

domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the equipment's operator's manual and load charts are kept in the cab and readily available, since OSHA requires rated capacities, operating speeds, and hazard warnings to be accessible to the operator per 1926.1417(c).
  2. Have the competent person monitor wind conditions and adjust equipment/operations to address the effect of wind on equipment stability and rated capacity, per 1926.1417(n).
  3. Apply manufacturer-specified wind speed derating or shutdown thresholds from the load chart or operator's manual; where the manufacturer's documentation doesn't address wind, follow employer-developed procedures per 1926.1417(b).
  4. When a local storm warning is issued, have the competent person determine whether manufacturer recommendations for securing the equipment (e.g., boom position, out-of-service procedures) need to be implemented.
  5. Do not operate the equipment in excess of its rated capacity as affected by wind derating, per 1926.1417(o).

Known gotchas

Related routes

Confirm a crane operator meets OSHA's certification and evaluation requirements under 1926.1427 before operating on a steel erection project
osha.gov · 5 steps · unrated
Apply OSHA 1926.1412's special inspection triggers (idle equipment, severe service/severe weather exposure) that a crane inspection company must recognize outside the routine shift/monthly/annual cycle
osha.gov · 5 steps · unrated
Verify the load-chart and rated-capacity duties a crane operator must follow under 29 CFR 1926.1417
osha.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans