Design and get a state DOT to approve a Superpave volumetric hot-mix-asphalt job mix formula (JMF) under AASHTO M323.

domain: Asphalt paving contractor / QC lab · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Run gyratory compactor trial blends at the design number of gyrations (Ndesign) and check VMA, VFA, and Pba against AASHTO M323 criteria for the traffic level.
  2. Run moisture susceptibility testing (AASHTO T283, tensile strength ratio) and confirm the mix meets the DOT's minimum TSR.
  3. Account for RAP/RAS binder contribution in the effective binder content calculation rather than treating RAP as inert aggregate.
  4. Assemble the JMF package (aggregate sources, gradation, binder grade/content, volumetrics, TSR) per the DOT's required submittal format.
  5. Submit for DOT mix design approval and address any requested trial-batch or plant-verification testing before production begins.

Known gotchas

Related routes

Get a hot-mix asphalt plant qualified/certified to supply material on a specific state DOT-funded paving project.
Asphalt paving contractor / plant QC manager · 5 steps · unrated
Confirm a warm-mix asphalt (WMA) technology is approved for use on a specific state DOT paving contract and set compaction temperatures accordingly.
Asphalt paving contractor / mix design engineer · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans