Confirm code-required blower door air leakage (ACH50) testing thresholds under the locally adopted IECC

domain: codes.iccsafe.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Identify the IECC edition and any state/local amendments currently adopted in the jurisdiction, since ACH50 limits and section numbers vary by edition
  2. As a reference point, note 2021 IECC R402.4.1.2 sets 5 ACH50 for Climate Zones 1-2 and 3 ACH50 for Climate Zones 3-8, subject to local amendment
  3. Confirm testing must be performed per ANSI/RESNET/ICC 380, ASTM E779, or ASTM E1827 and reported at 50 Pa (0.2 in. w.g.)
  4. Check for dwelling-unit-specific exceptions (e.g., small or attached units tested under a CFM-per-square-foot enclosure-area method instead of ACH50)
  5. Document and submit test results in the format required for the final energy-code inspection sign-off

Known gotchas

Related routes

Determine when duct leakage (duct blaster) testing is required and its thresholds under the locally adopted IECC
codes.iccsafe.org · 5 steps · unrated
Cite ANSI/RESNET/ICC 380 blower-door and duct-leakage test procedures correctly
resnet.us · 4 steps · unrated
Perform a multi-point orifice blower-door airtightness test per ASTM E1827
astm.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans