Determine when duct leakage (duct blaster) testing is required and its thresholds under the locally adopted IECC

domain: codes.iccsafe.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the locally adopted IECC's mandatory duct testing provision applies to the project, noting exceptions exist for ducts entirely within conditioned space with limited connections
  2. Determine test timing: rough-in test (with or without the air handler installed) versus post-construction/final test
  3. Confirm the applicable leakage thresholds referenced by the code, commonly expressed as CFM25 per 100 sq ft of conditioned floor area, with separate limits for total leakage versus leakage to outside
  4. Perform the test per the referenced standard (e.g., ASTM E1554 fan pressurization duct test method)
  5. Document and submit results for the energy-code inspection

Known gotchas

Related routes

Confirm code-required blower door air leakage (ACH50) testing thresholds under the locally adopted IECC
codes.iccsafe.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans