Complete and post the required insulation certificate at final inspection under the locally adopted IRC energy code

domain: codes.iccsafe.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the applicable section for the adopted IRC edition (e.g., N1101.14 in the 2018 IRC; renumbered to N1101.10.1 in the 2021 IRC)
  2. For blown or sprayed materials without a visible manufacturer R-value mark, complete the certificate documenting installed thickness, settled thickness, settled R-value, installed density, coverage area, and bag count (fiberglass/cellulose) or installed thickness and R-value (SPF)
  3. Sign and date the certificate as the installer
  4. Post the certificate in a conspicuous location in the building, commonly near the electrical panel or attic access, immediately after installation
  5. Retain a copy for project records in case the posted certificate is damaged, removed, or questioned at final inspection

Known gotchas

Related routes

Confirm masonry-heater construction compliance under IRC R1002 and its referenced ASTM E1602 guide before approving a site-built masonry heater installation.
codes.iccsafe.org · 4 steps · unrated
Look up prescriptive insulation R-value and fenestration U-factor requirements by climate zone in the locally adopted IECC
codes.iccsafe.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans