Confirm and size a new-construction residential solar (and possibly storage) system to satisfy California Title 24 Part 6 solar mandate compliance
domain: solar.compliance · 6 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗
Steps
Confirm which Title 24 Energy Code cycle applies to the permit date — the 2025 Energy Code took effect January 1, 2026 and governs permits issued from that date forward
For single-family homes and low-rise multifamily (up to 3 stories), confirm a PV system is required sized to offset the building's expected annual electricity use, based on floor area, orientation, climate zone, and the building's other efficiency measures
For commercial, high-rise residential, and other covered nonresidential building types, confirm both solar PV and battery storage are required per the expanded 2023-cycle scope, sized to conditioned floor area and building type
If a battery is being added, apply the documented storage credit: installing 7.5 kWh or more allows a 25% reduction in the otherwise-required PV system size
Verify roofing material meets the code's thermal emittance / 3-year aged reflectance / Solar Reflectance Index (SRI) requirements for new construction and re-roofing, since these interact with the same code section
Route final sizing calculations through the project's Title 24 energy consultant/CF1R compliance documentation rather than estimating informally
Known gotchas
The battery-storage size-reduction credit (7.5 kWh → 25% PV reduction) is a specific documented allowance, not a general rule of thumb — verify the exact CEC formula for the specific project rather than assuming any battery size qualifies
Commercial/high-rise storage mandates were added in the 2023 code cycle and are broader in scope than the original 2019 residential-only solar mandate — don't apply residential-only assumptions to commercial projects
Compliance is generally keyed to permit issuance date, not construction start — confirm which code cycle governs based on when the permit is (or was) issued
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?