Identify the documentation and retention requirements a crane inspection company must meet after a 1926.1412 monthly or annual inspection

domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Fetch current 29 CFR 1926.1412 text and locate the documentation subsection
  2. Confirm required contents: items checked, inspection results, inspector's name and signature, and date
  3. Confirm minimum retention period is 12 months for the documented inspection record
  4. Check separately whether monthly inspection records carry a shorter retention window before assuming a single retention period applies to all categories
  5. Advise the inspection company to retain records in a format retrievable on request by OSHA compliance officers

Known gotchas

Related routes

Perform and document the OSHA-required annual and monthly (frequent) crane inspections under 29 CFR 1926.1412
osha.gov · 5 steps · unrated
Determine what OSHA's annual/comprehensive crane inspection under 29 CFR 1926.1412(f) requires and how long the inspection records must be retained.
osha.gov (29 CFR 1926.1412) · 5 steps · unrated
Confirm post-assembly inspection obligations under OSHA 1926.1404 and 1926.1412(c) for an inspection company verifying a newly assembled crane before first use
osha.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans