Document Pre-Demolition Conditions of Adjacent Properties

domain: nyc.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Before demolition/excavation begins, commission a pre-construction condition survey of adjacent properties within the zone of influence, documenting cracks, settlement, and plumbness with dated, geotagged photographs and written notes.
  2. Have the survey signed by a licensed engineer where locally required — for example, NYC Technical Policy and Procedure Notice 10/88 requires monitoring of historic structures within a defined distance of construction.
  3. Install crack monitors, settlement pins, or tell-tales on structures showing existing distress or falling within the monitoring radius, and record baseline readings before work starts.
  4. Set vibration and settlement action thresholds based on local requirements or a recognized guideline where no local standard exists, defining a level that halts work if exceeded.
  5. Repeat photographic and instrument documentation periodically during demolition and again at completion to build a clear before/during/after record.

Known gotchas

Related routes

Document a termite pretreatment for new construction correctly
hud.gov · 5 steps · unrated
Document Construction Waste Management for a LEED Demolition Package
usgbc.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans