Perform and document the monthly wire rope inspection required under 29 CFR 1926.1413

domain: osha.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm which wire ropes on the equipment (running and standing) fall under 1926.1413's shift and monthly inspection requirements
  2. Perform the required shift inspection of all visible rope each shift per 1926.1413(a)
  3. Perform the monthly inspection covering the same items, and include any deficiency the annual-inspection qualified person flagged for ongoing monitoring
  4. Document the monthly inspection per the requirements referenced in 1926.1412(e)(3) and retain records for the required retention period
  5. Remove wire rope from service if the inspection identifies a condition requiring corrective action, and do not use it again until corrected and reinspected

Known gotchas

Related routes

Perform and document the OSHA-required annual and monthly (frequent) crane inspections under 29 CFR 1926.1412
osha.gov · 5 steps · unrated
Apply OSHA 1926.1413 wire rope removal criteria during a running-rope inspection performed by a third-party inspection company
osha.gov · 5 steps · unrated
Perform and document synthetic and wire rope sling inspections per ASME B30.9
asme.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans