Comply with NYC Local Law 15 of 2020 bird-friendly glazing material requirements on a curtain wall submittal

domain: nyc.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the current text and any amendments to Local Law 15 of 2020 and its implementing DOB bulletin/guidance document on nyc.gov before applying it, since bulletins are periodically updated.
  2. Confirm the law's height/location triggers as currently published — generally exterior wall envelope up to 75 feet above grade, glazing adjacent to green roofs up to 12 feet above the walking surface, and any bird hazard installation regardless of height — but verify these thresholds against the current DOB guidance rather than a secondary summary.
  3. Confirm the material threat-factor rating threshold (materials scoring at or below the current published threshold on the referenced bird-collision threat factor rating scale) required for compliance, and require manufacturer documentation of the tested rating for the specific glazing product/pattern proposed.
  4. Verify the compliance pathway applies based on filing date (new construction and qualifying alterations filed on or after the law's effective date) — confirm this against DOB's current guidance for the specific project filing.
  5. Coordinate with the DOB plan examiner on acceptable documentation format for demonstrating compliance in construction documents, since bird-friendly compliance is typically documented via a schedule/legend on the drawings.

Known gotchas

Related routes

Determine whether a proposed new commercial building or full-glazing-replacement project in New York City must comply with bird-friendly glazing requirements under Local Law 15 of 2020.
nyc.gov · 5 steps · unrated
Determine whether a San Francisco building project falls under Planning Code Section 139 bird-safe glazing standards and what glazing treatment satisfies it.
sfplanning.org / codelibrary.amlegal.com · 5 steps · unrated
Determine the current Local Law 11 / FISP facade-inspection interval for a building, given the 2025–2026 reform legislation.
nyc.gov (DOB / NYC Council Legistar) · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans