Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗
Steps
Confirm the MCP requirement sits in A17.1 Part 8, Section 8.6 ('Maintenance, Repair, Replacement, and Testing'), with the MCP content requirement specifically at 8.6.1.2 in post-2000 editions.
Confirm the building owner — not the maintenance contractor — bears ultimate responsibility for ensuring a compliant MCP exists and is followed, even though the contractor executes the maintenance.
Verify a separate, unit-specific MCP exists for each individual conveyance, even when multiple identical units exist in the same building.
Confirm the MCP documents examination, testing, cleaning, lubrication, and adjustment tasks with defined intervals for each applicable component.
Verify MCP records are retained a minimum of 5 years per 8.6.1.4 and remain available on-site, physically or electronically; reference Nonmandatory Appendix Y for a records template.
Known gotchas
A single shared MCP document covering multiple identical units in one building is non-compliant — each unit needs its own MCP.
Exact record-retention and on-site-access details can vary by the locally adopted edition/amendments — confirm against the specific edition adopted by the AHJ.
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?