For general steel erection activity on a walking/working surface with an unprotected side or edge more than 15 feet above a lower level, provide guardrails, safety nets, personal fall arrest, positioning devices, or fall restraint per 1926.760(a).
For connectors working more than two stories or 30 feet above a lower level, require conventional fall protection (fall arrest, restraint, positioning device, or equivalent) per 1926.760(b).
For connectors working above 15 and up to 30 feet, at minimum provide a personal fall arrest system (or other allowable fall protection) and require the connector to have the tie-off equipment on and available, per 1926.760(b).
Where a controlled decking zone (CDZ) is used during initial deck installation between 15 and 30 feet, confirm the zone is no more than 90 ft wide by 90 ft deep from the leading edge, does not exceed 3,000 sq ft of unsecured decking, and has clearly marked boundaries per 1926.760(c).
Confirm final deck attachment and shear connector installation are not performed by employees working inside an active CDZ.
Known gotchas
The 15-foot general threshold and the 30-foot connector threshold are frequently confused — a connector is not automatically exempt from fall protection below 30 feet; the 15-30 ft band still requires available/worn PFAS-type equipment.
CDZ dimensional limits (90x90 ft, 3,000 sq ft) are hard caps, not guidelines — exceeding either voids the CDZ substitution for conventional fall protection.
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?