Specify and inspect drip edge installation at eaves and rakes for IRC compliance

domain: construction.roofing.residential.steep-slope · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm drip edge is being installed at both eaves and rake edges of the shingle roof — it is required at both locations under current IRC roof-assemblies provisions.
  2. Verify the metal extends not less than 1/4 inch below the roof sheathing and back up onto the deck not less than 2 inches.
  3. Confirm adjacent drip-edge sections are overlapped not less than 2 inches.
  4. Check mechanical fastening is spaced at no more than 12 inches on center, using fasteners meeting the same corrosion-resistance/type requirements as the shingle fasteners.
  5. Verify underlayment sequencing: underlayment goes over the drip edge at eaves but under the drip edge at rakes — a commonly reversed detail that fails inspection.

Known gotchas

Related routes

Specify and install code-compliant drip edge at eaves and rakes for an asphalt shingle roof per IRC R905.2.8.5.
iccsafe.org · 5 steps · unrated
Verify a landscape irrigation sprinkler or emitter product's compliance claim against the ASABE/ICC 802 Landscape Irrigation Sprinkler and Emitter Standard before specifying it on a job that references the standard.
ASABE (asabe.org) / ICC (iccsafe.org) · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans