Determine SPCC plan requirements for fuel/oil storage at a land-clearing job site under EPA's 40 CFR Part 112 rule

domain: epa.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Total the site's aboveground oil storage capacity (fuel tanks, lube totes, hydraulic oil, etc.) across all containers 55 gallons or larger
  2. If aggregate aboveground capacity exceeds 1,320 gallons and there's a reasonable expectation of a discharge to navigable waters or adjoining shorelines, treat the site as SPCC-regulated
  3. Prepare a written SPCC Plan covering spill prevention procedures, secondary containment design, and countermeasures
  4. Have the plan certified by a licensed Professional Engineer unless the facility qualifies for a self-certification tier under the rule's small-facility provisions
  5. Keep the plan on-site or reasonably accessible and update it whenever site conditions materially change (new tanks added, layout changes, etc.)

Known gotchas

Related routes

Determine air permitting requirements for a hot-mix asphalt plant under EPA New Source Performance Standards (NSPS) Subpart I.
Asphalt paving contractor / plant environmental compliance manager · 5 steps · unrated
Query EPA Envirofacts for facility environmental/compliance records near a bulk propane storage site
www.epa.gov · 5 steps · unrated
Apply 40 CFR Part 503 requirements when land-applying domestic septage instead of hauling to a treatment plant
epa.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans