Select an approved backer board (not greenboard) for tile in tub/shower surrounds per IBC

domain: codes.iccsafe.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm code requires cement, fiber-cement, or glass-mat gypsum backers (complying with ASTM C1288, C1325, or C1178, or ANSI A118.9 for cementitious backer units) behind tile in tub/shower areas
  2. Do not specify standard water-resistant gypsum board (greenboard) as a tile backer inside the direct wet zone of a tub/shower enclosure
  3. Select the backer per manufacturer installation instructions and the applicable product standard for the chosen backer type
  4. Verify the backer choice matches the waterproofing method (topical membrane vs. inherently water-resistant panel) specified for the assembly
  5. Confirm greenboard use, where allowed, is limited to areas with only indirect moisture exposure outside the direct wet zone

Known gotchas

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans