Perform and log the annual maintenance inspection of a low-energy automatic operator to confirm it still meets its governing standard after a year of use.

domain: manufacturer O&M manual / AAADM · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Schedule the low-energy operator's annual inspection per the manufacturer's maintenance manual and the applicable low-energy operator standard.
  2. Inspect activation devices, breakaway hardware, and door speed/force settings to confirm they remain within the standard's limits after a year of wear.
  3. Confirm the door has not been field-modified to add sensor activation without also being upgraded to comply with the full-power standard's safety requirements.
  4. Test manual/breakout operation to confirm the door can still be pushed open by hand in a power-loss or emergency scenario, as required for its egress function.
  5. Log the inspection with date, technician, findings, and corrective actions in a maintained facility record, distinct from any separate full-power annual inspection program log.

Known gotchas

Related routes

Decide whether a proposed automatic operator installation qualifies as low-energy knowing-act (A156.19) or must instead meet full-power sensor-activated (A156.10) requirements.
buildershardware.com (BHMA) · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans