Determine Whether EPA RRP Applies to a Demolition vs. Renovation Project

domain: epa.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Determine if the project is a full demolition of an entire free-standing structure (RRP does not apply) or a partial demolition/renovation of a pre-1978 building (RRP likely applies).
  2. If deconstruction or salvage occurs alongside a total demolition, confirm it's part of that full demolition rather than a stand-alone renovation, to remain outside RRP.
  3. For partial demolition or renovation of pre-1978 target housing or child-occupied facilities, use an EPA/state lead-certified firm and RRP-certified renovators following lead-safe work practices.
  4. Remember window replacement and demolition of painted surfaces are always covered by RRP, regardless of the square-footage thresholds that exempt small minor-repair jobs.
  5. Document the full-demolition-vs-renovation determination in the project file in case EPA or the state program requests evidence supporting the RRP exemption.

Known gotchas

Related routes

Determine whether the EPA RRP (Renovation, Repair and Painting) rule or its full-demolition exemption applies to a pre-1978 residential project
epa.gov · 5 steps · unrated
Determine RRP emergency-provision exemption eligibility for post-disaster renovation work
www.epa.gov · 5 steps · unrated
Determine When a PE-Stamped Engineered Demolition Plan Is Required
osha.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans