Track the UAD 3.6 / URAR redesign policy timeline (form changes, not the UCDP submission API)

domain: real-estate-appraisal-regulatory · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the UAD 3.6 broad production period began January 26, 2026, meaning lenders/appraisers could begin submitting reports in the new format from that date.
  2. Confirm the mandate/cutover date after which the new UAD 3.6 format becomes required is November 2, 2026 at time of writing — verify this directly on Fannie Mae/Freddie Mac's UAD redesign pages before relying on it, since GSE mandate dates have shifted before.
  3. Treat this as the policy/format timeline only — the actual submission mechanics go through UCDP, which existing reference material already covers separately.
  4. Identify at a high level what changes under the redesign (e.g., a single dynamic UAD 3.6-based report replacing legacy form-specific report types) without asserting specific field-level changes unless confirmed on the GSEs' current documentation.
  5. Check the GSEs' UAD 3.6 implementation pages for the latest milestone dates before any client-facing commitment, since interim deadlines have been adjusted during the multi-year rollout.

Known gotchas

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans