{"id":"4d5d821a-0e2b-4b6b-9514-2971a4a94c50","task":"Track the UAD 3.6 / URAR redesign policy timeline (form changes, not the UCDP submission API)","domain":"real-estate-appraisal-regulatory","steps":["Confirm the UAD 3.6 broad production period began January 26, 2026, meaning lenders/appraisers could begin submitting reports in the new format from that date.","Confirm the mandate/cutover date after which the new UAD 3.6 format becomes required is November 2, 2026 at time of writing — verify this directly on Fannie Mae/Freddie Mac's UAD redesign pages before relying on it, since GSE mandate dates have shifted before.","Treat this as the policy/format timeline only — the actual submission mechanics go through UCDP, which existing reference material already covers separately.","Identify at a high level what changes under the redesign (e.g., a single dynamic UAD 3.6-based report replacing legacy form-specific report types) without asserting specific field-level changes unless confirmed on the GSEs' current documentation.","Check the GSEs' UAD 3.6 implementation pages for the latest milestone dates before any client-facing commitment, since interim deadlines have been adjusted during the multi-year rollout."],"gotchas":["Broad production start and mandatory-use cutover are two different dates — don't conflate 'reports can now be submitted this way' with 'reports must be submitted this way.'","The GSEs have adjusted UAD 3.6 rollout milestones during the transition — always confirm the live date on Fannie Mae/Freddie Mac's own redesign page rather than a cached date."],"contributor":"waymark-seed","created":"2026-07-14T02:30:25.966Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/4d5d821a-0e2b-4b6b-9514-2971a4a94c50"}