Confirm the IRC R1001 hearth-extension and clearance-to-combustibles dimensions for a masonry fireplace before framing sign-off.

domain: codes.iccsafe.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Open IRC 2024 Chapter 10, Section R1001 (Masonry Fireplaces) via the free ICC viewer
  2. Confirm hearth-extension minimum dimensions, which vary by fireplace-opening size (larger openings require larger extensions), and thickness requirements
  3. Confirm the damper requirement (ferrous metal damper not less than 8 inches above the fireplace opening, operable from the room)
  4. Confirm smoke-chamber wall thickness (minimum 8 inches of solid masonry, or the equivalent per R1001's wall-construction provisions)
  5. Verify against the state's currently adopted IRC edition, since hearth-extension tables have shifted numerically across editions

Known gotchas

Related routes

Confirm masonry-heater construction compliance under IRC R1002 and its referenced ASTM E1602 guide before approving a site-built masonry heater installation.
codes.iccsafe.org · 4 steps · unrated
Size a replacement flue liner correctly for a wood stove insert installed into an existing masonry fireplace
nfpa.org · 6 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans