Determine the CalGreen construction and demolition (C&D) debris diversion requirement and compliance path for a California project

domain: calrecycle.ca.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the project type is covered — CalGreen Sections 4.408 (residential, mandatory) and 5.408 (nonresidential) apply to most new construction, demolition, and certain addition/alteration permits
  2. Under Section 4.408.1, plan to recycle and/or salvage a minimum of 65% of nonhazardous C&D debris generated by the project, per the standard compliance path
  3. Prepare and submit a Construction Waste Management Plan (per Section 4.408.2) prior to building permit issuance, signed by the owner, describing materials to be diverted and the diversion method
  4. If using the weight-based alternative compliance path instead of the 65% method, confirm the current per-square-foot disposal thresholds in Section 4.408.4/4.408.4.1 with the local enforcing agency, since these figures are periodically revised between code cycles
  5. Check with the local jurisdiction (city/county) for any locally amended C&D ordinance that layers additional reporting or a higher diversion rate on top of the state CalGreen minimum

Known gotchas

Related routes

Meet CalGreen's 65% C&D Debris Diversion Mandate and Document It
calrecycle.ca.gov · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans