Meet CMHA (formerly ICPI) aggregate base and compaction specifications when preparing a subgrade for interlocking or permeable paver installation

domain: cmha.org · 6 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Specify local aggregate base material meeting ASTM D2940 gradation where a local DOT spec isn't otherwise required.
  2. Compact aggregate base to at least 98% standard Proctor density (ASTM D698) for pedestrian areas and residential driveways.
  3. Compact to 98% modified Proctor density (ASTM D1557) for vehicular/traffic-bearing areas.
  4. Screed the base surface to a tolerance of ±3/8 in. over a 10 ft straightedge before placing bedding sand.
  5. Use bedding sand conforming to ASTM C33 (or CSA A23.1 FA1) concrete-sand gradation, not mason/play sand.
  6. Reference current CMHA Tech Spec/PAV bulletins for permeable (PICP) systems, which specify different open-graded base requirements than standard ICP.

Known gotchas

Related routes

Become a CMHA Certified Concrete Paver (ICP) Installer for interlocking concrete pavement work
cmha.org · 5 steps · unrated
Find current CMHA technical resources for segmental retaining wall (SRW) design, given the 2022-2023 ICPI/NCMA unification
cmha.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans