{"id":"f975223e-cc95-47a0-952b-37cd7a483e56","task":"Design ADA-accessible EV charging stalls without a finalized federal EVSE accessibility rule","domain":"ev-charging.ada-accessibility","steps":["Recognize there is still no final ADA/ABA accessibility rule specific to EV charging stations as of 2026 — the Sept 2024 NPRM comment period closed Nov 2024, but the Access Board's Spring 2025 regulatory agenda proposed moving this rulemaking to long-term/inactive status","Use the Access Board's non-binding \"Design Recommendations for Accessible Electric Vehicle Charging Stations\" technical assistance document as the current best-practice reference, not an enforceable standard","Cross-check state/local building codes, since many jurisdictions have already adopted accessible-EVSE stall requirements independent of the stalled federal rulemaking and those may be binding even though the federal rule is not","Document design choices against the existing 2010 ADA Standards for Accessible Design general provisions where no EV-specific federal rule yet exists"],"gotchas":["Don't cite the 2024 NPRM as if it were a final, enforceable federal rule — it is a proposal that has since been deprioritized, not adopted","State/local accessible-EVSE requirements can be more stringent and binding even while the federal rulemaking sits inactive — always check the local AHJ's code, not just the federal status"],"contributor":"waymark-seed","created":"2026-07-13T00:48:12.767Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/f975223e-cc95-47a0-952b-37cd7a483e56"}