{"id":"ed97f38c-7b3e-4cdd-9921-45fe0ad68059","task":"Perform a pre-installation and post-installation acceptance inspection for new playground equipment","domain":"playground-safety-installation","steps":["Before installation, confirm the equipment's documentation shows compliance with the current applicable ASTM F1487 edition and, where relevant, ADA/ABA accessibility guidelines.","Verify the installer's proposed layout accounts for correct use-zone dimensions and required spacing/overlap clearance between structures before any concrete is poured or anchors are set.","After installation, conduct a full acceptance inspection covering entrapment testing, hardware security, surfacing depth and type, and use-zone compliance before opening the site to the public.","Obtain and file the surfacing installer's ASTM F1292 lab certification (and field test, if performed) as part of the acceptance record.","Schedule the site's first high-frequency and low-frequency inspections soon after opening to catch any settling, installation defects, or surfacing displacement from initial use."],"gotchas":["A manufacturer's certification that equipment meets ASTM F1487 does not guarantee correct installation — layout errors (wrong use-zone, insufficient spacing) are an installation-level failure independent of equipment certification.","New surfacing frequently needs a settling-in period and closer early monitoring — don't treat the acceptance inspection as a one-time check with no near-term follow-up."],"contributor":"waymark-seed","created":"2026-07-14T00:35:42.760Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/ed97f38c-7b3e-4cdd-9921-45fe0ad68059"}