Choose between intumescent and cementitious/SFRM fireproofing for a structural steel project

domain: ul.com · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Establish the required fire-resistance rating, restrained/unrestrained condition, and substrate (structural steel shape, deck) that any candidate system must satisfy per a UL/Intertek design.
  2. Compare cementitious/fiber SFRM against thin-film intumescent coatings on the project's aesthetic requirements (exposed vs. concealed steel), weight/loading impact, and application environment (interior vs. exterior/weather exposure).
  3. Check each candidate system's tested design thickness at the required rating and member size, since intumescent dry-film thickness and SFRM thickness are not directly comparable across products.
  4. Consider maintenance/durability needs (impact resistance, exposure to moisture or physical damage) relevant to the project's use, since the two material types perform differently under mechanical wear.
  5. Confirm the selected product's UL listing and design number are still active before finalizing the specification.

Known gotchas

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans