Check ADA Section 307 protruding-object clearance for an awning or canopy installed over a walkway

domain: compliance.ada-307-protruding-objects · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the awning/canopy and its support structure do not reduce the minimum required vertical clearance of the accessible route beneath it
  2. For any element (including canopy edges/supports) with a leading edge between 27 inches and 80 inches above the ground/floor, keep horizontal protrusion into the circulation path to 4 inches maximum
  3. For post- or pylon-mounted elements in that same 27-80 inch height band, cap horizontal overhang into the path at 12 inches maximum
  4. Maintain at least 80 inches of vertical clearance along the full accessible circulation path under any awning/canopy edge or support
  5. Reference the official 2010 ADA Standards Section 307 directly (access-board.gov) during design review rather than relying solely on a summary, since the protruding-object vs. post-mounted distinction changes which limit (4 in vs 12 in) applies

Known gotchas

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans