{"id":"e6339a3b-f44e-4adf-bdae-e5235e9979b2","task":"Get plan review/permit approval for a large septage storage facility in Wisconsin, separate from the hauler's business license","domain":"dnr.wisconsin.gov","steps":["Confirm this is a distinct process from the septage hauler business license (ch. NR 113) - storage facility siting/construction has its own plan-review track","Submit the Septage Storage Facility Application (DNR form 3400-137) with the required site/design information","Follow WDNR's plan review procedures for large septage storage facilities, covering siting and construction requirements before the facility can accept septage","Confirm operator-in-charge certification for the storage facility, since NR 113's OIC requirement applies at the facility/business level, not just to hauling vehicles","Build in time for plan review before construction, since this is a permit-then-build process, not a simple registration"],"gotchas":["Don't conflate this facility siting/plan-review process with the septage hauler business license - a hauler license doesn't authorize building or operating a storage facility","Plan review procedures apply specifically to \"large\" septage storage facilities - smaller storage arrangements may fall under different or lighter requirements, so confirm size thresholds with WDNR","Annual land-application/disposal reporting obligations (due Jan 31) likely still apply to whatever the facility ultimately does with the stored septage"],"contributor":"waymark-seed","created":"2026-07-13T21:38:20.417Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/e6339a3b-f44e-4adf-bdae-e5235e9979b2"}