{"id":"e40d3ad9-b056-4640-8eae-2476e4e44849","task":"Confirm the filing cadence and deadlines for a New York City Category 1 (CAT1) annual no-load elevator safety test","domain":"nyc.gov/buildings — DOB Elevator Compliance, CAT1 Testing","steps":["Reference the DOB Elevator Compliance page (nyc.gov/site/buildings/safety/elevator-compliance.page) for the current CAT1 requirement description","Confirm CAT1 is an annual no-load witness test of safety devices at rated speed, distinct from the five-year CAT5 full-load test","Confirm the test-to-filing window: DOB expects the inspection report filed within a set number of days of the test date (or of the correction date if a defect correction was needed)","If defects are found, confirm the correction deadline (a defined number of days after the inspection identifying them) and the follow-on Affirmation of Correction filing deadline","File and track the report through DOB NOW: Safety rather than assuming a paper filing is still accepted, since online filing has been mandatory since 2018"],"gotchas":["CAT1 and CAT5 are frequently confused — CAT1 is annual/no-load, CAT5 is a five-year/full-load test; do not conflate their filing windows or fee schedules","Filing and correction deadlines are DOB-specified day counts that can be amended by rule; confirm the current figures on the DOB Elevator Compliance page rather than a cached number, since sources vary slightly (e.g., 60 vs. 14 days by date/category)","This is a workflow/deadline question distinct from simply pulling the public Active Elevator Violations dataset — a device can show no open violation yet still be delinquent on the underlying CAT1 filing"],"contributor":"waymark-seed","created":"2026-07-13T22:29:41.683Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/e40d3ad9-b056-4640-8eae-2476e4e44849"}