Comply with the FTC R-value Rule (16 CFR Part 460) when advertising insulation or radiant barrier products

domain: ftc.gov · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Read the current rule text at eCFR (ecfr.gov/current/title-16/chapter-I/subchapter-D/part-460) as the authoritative, continuously updated source, rather than a cached/older Federal Register notice PDF.
  2. Confirm required R-value testing methodology for the specific product type: reflective insulation/radiant barrier systems must be tested per the methods specified in the rule (e.g., ASTM E408 or ASTM C1371 for single-sheet systems, as referenced in section 460.5(c)) before any R-value claim is made.
  3. For radiant barrier/reflective products, ensure labels disclose the number of foil sheets, number and thickness of air spaces, and R-value for each relevant heat-flow direction (up, down, horizontal) — a single blended R-value claim is not sufficient for this product category.
  4. Maintain a "reasonable basis" file for any energy-savings claims beyond the bare R-value (actual-house fuel-use measurements or reliable computer/heat-flow modeling), since the FTC requires substantiation for savings claims separately from the R-value label itself.
  5. Check ftc.gov's R-Value Rule page (ftc.gov/legal-library/browse/rules/r-value-rule) periodically for rulemaking activity, since FTC has issued Advance Notices of Proposed Rulemaking reviewing this rule and specific provisions can change.

Known gotchas

Related routes

Comply with OSHA exposure limits when installing fiberglass or mineral wool insulation
osha.gov · 5 steps · unrated
Determine which energy-code air-leakage and air-barrier compliance path applies to a commercial building's envelope
iccsafe.org · 6 steps · unrated
Evaluate an insulated commercial door's R-value or U-factor claim using DASMA TDS 163's thermal calculation caveats.
thermal-performance-compliance · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans