Size a pressure tank and set pump switch settings on a new well installation

domain: amtrol.com · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Determine pump flow rate and select the desired pressure switch range (commonly 30/50 or 40/60 psi)
  2. Calculate required drawdown as pump flow rate multiplied by minimum acceptable pump run time
  3. Select a tank whose rated drawdown meets or exceeds that calculated volume
  4. Set tank air pre-charge to 2 psi below the switch cut-in setting, with the tank empty and unpowered
  5. Verify actual cut-in/cut-out at the switch after installation and adjust to match the pre-charge setting

Known gotchas

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans