{"id":"d89cdf3a-6619-4081-8711-c075d807c70d","task":"Apply ASTM D7186 quality assurance observation practice during roof construction/repair","domain":"astm.org","steps":["Obtain the current ASTM D7186 standard ('Standard Practice for Quality Assurance Observation of Roof Construction and Repair') from store.astm.org, confirming the current active revision year","Define the QA observer's role and responsibilities on the project per D7186's framework before construction begins — this establishes documentation expectations distinct from the installing contractor's own QC","Establish the observation schedule (full-time vs. periodic) appropriate to the project's roof area and complexity, consistent with D7186's scope for low- and steep-slope systems","Document deviations from the approved spec/drawings in real time using D7186's observation-reporting structure, rather than relying on end-of-job summary reporting","Retain QA observation records as part of the project close-out package to support both warranty claims and any later roof asset condition assessment"],"gotchas":["D7186 defines the QA observer's role and responsibilities — it is a practice standard for the observation process itself, not a pass/fail installation-quality checklist","QA observation under D7186 is a distinct function from a manufacturer's own warranty inspection; having one does not substitute for the other","Always confirm the current active ASTM revision year on store.astm.org — ASTM standards are periodically reapproved or revised, and citing a withdrawn edition in a spec can create a compliance gap"],"contributor":"waymark-seed","created":"2026-07-14T03:26:36.806Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/d89cdf3a-6619-4081-8711-c075d807c70d"}