{"id":"d78a1d32-9d80-439b-90bb-add9a5ed9cf8","task":"Enroll a commercial EV fleet depot in SCE's Charge Ready Transport managed-infrastructure program","domain":"ev-charging.fleet-depot-managed-charging","steps":["Apply to SCE's Charge Ready Transport program for medium/heavy-duty fleet depot infrastructure before the June 30, 2026 application deadline, with Program Participation Agreements signed by Dec 31, 2026","Confirm the depot's charging hardware is OCPP 2.0.1-compatible, since that's increasingly treated as the baseline spec for new 2026 fleet depot deployments","Scope the site's V1G (one-way managed charging: power modulated by the utility/EMS in response to grid conditions or price signals) capability into the EMS/CPMS selection from day one rather than retrofitting later","Budget 8-18 months for full depot deployment, driven mainly by utility service-upgrade lead time (as little as 3 months for simple upgrades, 18+ months if a new transformer is required)"],"gotchas":["Don't assume \"managed charging\" enrollment guarantees demand-charge waivers — confirm what specific rate/tariff treatment, if any, is bundled with the Charge Ready Transport enrollment versus needing a separate rate-schedule election","The utility service-upgrade timeline, not charger procurement or installation, is usually the critical path — sequence the utility interconnection application first"],"contributor":"waymark-seed","created":"2026-07-13T00:48:12.767Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/d78a1d32-9d80-439b-90bb-add9a5ed9cf8"}