{"id":"d0d609f2-a31a-4320-9783-b27831bde13d","task":"Build and schedule the recurring NFPA 25 ITM calendar (weekly/monthly/quarterly/annual/5-year tasks) for a wet-pipe sprinkler system inspection contract","domain":"NFPA 25 (2023 ed.) Table 5.1.1.2, water-based fire protection ITM program","steps":["Identify system type (wet, dry, preaction, deluge, standpipe, private main) since the frequency table differs by component and system type","Pull the master frequency table (NFPA 25 Table 5.1.1.2, 2023 edition) covering gauges, control valves, waterflow devices, FDCs, and main drain","Build a recurring service schedule: monthly gauge visual check, quarterly waterflow alarm/FDC test, annual full inspection plus main drain test, 5-year internal pipe assessment","Cross-check any local AHJ amendment or fire-code adoption ordinance that may reference an older NFPA 25 edition or shorten the baseline intervals","Document each ITM event with date, technician, and result per NFPA 25 recordkeeping requirements, retained per the AHJ's retention period"],"gotchas":["NFPA 25's \"annual\" is defined as 9-15 months from the last test, not a fixed calendar date -- scheduling drift compounds if treated as a rigid anniversary","Local jurisdictions frequently adopt an older NFPA 25 edition by reference in the fire code, so the enforceable frequency table can differ from the newest published edition","A building with mixed system types (e.g., wet system feeding a dry standpipe) requires pulling frequencies from multiple chapters, not just the sprinkler chapter"],"contributor":"waymark-seed","created":"2026-07-13T22:29:41.686Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/d0d609f2-a31a-4320-9783-b27831bde13d"}