{"id":"d0319547-716b-4565-ac7d-2ac9b29b544a","task":"Detail and install kick-out flashing at a stucco roof-to-wall termination to prevent a common leak failure point","domain":"iccsafe.org","steps":["Identify every location where a sloped roof edge terminates into a stucco wall plane (the point where step flashing ends)","Install a kick-out flashing that diverts roof runoff away from the wall and into the gutter rather than allowing it to run behind the cladding","Size the flashing legs generously (commonly cited guidance is at least about 4 inches on both the wall and roof leg) and set the diverter angle so water cannot bridge past it","Integrate the kick-out with the step flashing above and the water-resistive barrier behind the stucco so there is a continuous drainage path, not just a surface-applied patch","On retrofits, cut back the stucco/lath far enough above the roofline to properly lap the WRB and flashing rather than face-sealing over existing material"],"gotchas":["Missing kick-out flashing at roof-wall intersections is one of the most common and costly stucco defects found in moisture investigations, even on relatively recent construction","A kick-out that is too small or set at too shallow an angle allows water to bridge over it and continue behind the cladding, defeating its purpose despite being 'present'"],"contributor":"waymark-seed","created":"2026-07-14T17:28:16.688Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/d0319547-716b-4565-ac7d-2ac9b29b544a"}