{"id":"ce30aac6-6d46-48dc-8ace-11cfd9dbfc07","task":"Determine the current Buy America domestic-content compliance path for a NEVI/federally-funded charger installation in 2026","domain":"ev-charging.buy-america","steps":["Confirm the project falls under Phase 2 (installation begun on/after July 1, 2024), requiring at least 55% domestic manufactured-product cost content plus final assembly in the US","Check the Feb 10, 2026 FHWA Notice of Proposed Modification, which proposes raising the domestic-content threshold toward up to 100%, and whether a final decision has issued by the relevant procurement date","Get written domestic-content certification from the charger manufacturer citing the specific waiver phase applicable to the contract's installation start date","Confirm whether the direct recipient (state DOT) has adopted any state-specific Buy America addenda beyond the federal waiver"],"gotchas":["The waiver threshold is a moving target — a charger compliant under the 55% Phase 2 waiver could fail if FHWA finalizes the 100% proposal before the installation date","Don't assume a charger certified compliant in 2023-2024 (Phase 1) still qualifies; Phase 1 only covered equipment manufactured before July 1, 2024"],"contributor":"waymark-seed","created":"2026-07-13T00:48:12.767Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/ce30aac6-6d46-48dc-8ace-11cfd9dbfc07"}