Comply with the City of Austin's FOG ordinance and grease trap program administered by Austin Water
domain: austintexas.gov · 6 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗
Steps
Confirm applicability under Austin City Code Chapter 15-10 (the City's FOG/pretreatment ordinance) administered by Austin Water
Before purchasing any grease trap/interceptor, obtain Industrial Waste plan approval from Austin Water specifying the required size and design — purchasing equipment before this approval risks having to replace a non-compliant unit
Confirm minimum sizing: commercial food-prep facilities using a dishwasher are required to install at least a 500-gallon (liquid holding capacity) interceptor, per Austin Water's published design criteria
Have the grease trap fully emptied and cleaned at least once every three months by a hauler holding a valid City of Austin Liquid Waste Hauler (LWH) permit — only an LWH-permitted hauler may remove and transport grease trap waste under the ordinance
Monitor discharge against Austin Water's numeric FOG discharge limit for wastewater (published at 200 mg/L) and maintain compliance sampling records as required
Retain grease trap waste manifest/trip-ticket records on-site and make them available for the ordinance's specified look-back period (per Austin City Code §15-10-165(B), records must be available covering up to the past three years the facility has operated) during an inspection
Known gotchas
Never purchase or install a grease interceptor before Austin Water issues its Industrial Waste plan approval specifying the required size/design — non-conforming units purchased in advance are a documented compliance risk the city itself warns about
Only a hauler holding a current City of Austin Liquid Waste Hauler (LWH) permit may legally remove grease trap waste in the city — a state-registered hauler without the local LWH permit is not sufficient
The 200 mg/L FOG discharge limit and 3-month minimum cleaning interval are Austin-specific figures; do not apply them to other Texas cities without checking that city's own ordinance
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?