Design and commission a delayed-egress locking system for a retail, museum, or similar space where merchandise/collection security requires a brief exit delay.

domain: local fire marshal / iccsafe.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the occupancy is one where delayed egress is permitted under the specific building code edition adopted locally, and that a sprinkler or detection prerequisite for the space is satisfied.
  2. Configure the delay period and confirm it does not exceed the maximum allowed by the adopted code edition, and coordinate the exact required exit-sign wording with the AHJ.
  3. Wire the system so the delay electronics deactivate immediately upon sprinkler activation, fire alarm/smoke detection activation, or loss of power to the lock, always allowing free egress under those conditions.
  4. Confirm the door is not the sole means of egress from the space, since delayed egress locking is generally not permitted where no other compliant egress path exists.
  5. Coordinate with the fire alarm contractor and AHJ for acceptance testing and sign-off before occupancy.

Known gotchas

Related routes

Design and commission controlled egress locking on a Group I-1/I-2 behavioral health, dementia care, or similar clinical unit.
local fire marshal / iccsafe.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans