Install metal lath and furring per ASTM C1063 (fastening, lapping, furring over sheathing)

domain: astm.org · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Select a lath type and weight rated for the framing spacing and exposure per C1063
  2. Fasten lath at the spacing and penetration depth required for the substrate (wood, steel stud, or masonry)
  3. Lap side and end joints per C1063 (side laps typically overlap at least one mesh opening; end laps require a minimum overlap) and stagger vertical joints
  4. Furr lath away from the sheathing/WRB where furring is required so the lath is not in direct contact with the water-resistive barrier
  5. Reinforce corners, openings, and terminations with the appropriate accessory before plastering

Known gotchas

Related routes

Specify and install chain-link fence framework and installation practice to ASTM F1043 and ASTM F567.
astm.org · 5 steps · unrated
Select casing bead and other lath/furring accessories with appropriate corrosion resistance for stucco terminations
astm.org · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans