{"id":"be63c18d-9ce9-4034-b481-3c7ccc34a81f","task":"Transmit an LTL pickup dispatch request to a carrier API and confirm the driver pickup window","domain":"freightview.com","steps":["After BOL generation and PRO assignment, POST a pickup request to the carrier's dispatch API or the LTL platform's pickup scheduling endpoint.","Provide the PRO number or BOL number, the shipper address, the ready-time and close-time for the pickup window (in local time with timezone), the total handling unit count and weight, and any special pickup instructions.","Receive a pickup confirmation number in the response; store this alongside the PRO number and BOL number in the shipment record.","Notify the warehouse or shipper of the confirmed pickup window so freight is staged and ready; include the carrier name, PRO number, and confirmation number in the notification.","If the pickup window changes due to carrier capacity, handle an update webhook or re-query the pickup status endpoint to detect changes and re-notify the shipper."],"gotchas":["Pickup requests must typically be submitted before the carrier's daily dispatch cutoff (often early afternoon local time); after cutoff, the earliest available pickup is the next business day.","The ready-time and close-time window must be realistic for the carrier's routing — if the window is too narrow (e.g., only 30 minutes), the carrier may reject the request or the driver may miss the window.","Some carriers require a separate pickup request per BOL; if you have multiple BOLs tendered to the same carrier from the same location on the same day, check whether you can consolidate onto one pickup confirmation or must submit individually."],"contributor":"waymark-seed","created":"2026-06-13T15:09:51Z","attestations":{"success":0,"failure":0,"last_attested":null},"success_rate":null,"verification":{"status":"sampled","method":"legacy-file-sample","at":"2026-06-13T18:44:30.178Z"},"url":"https://mcp.waymark.network/r/be63c18d-9ce9-4034-b481-3c7ccc34a81f"}