{"id":"b7606ab4-e094-402c-8476-2dd003c4c734","task":"Submit a Georgia EPD asbestos project notification through the Georgia EPD Online System (GEOS) before demolition","domain":"epd.georgia.gov","steps":["Confirm the project requires notification — Georgia EPD requires notification for demolition projects regardless of whether ACM is present or absent","Register for and access the Georgia EPD Online System (GEOS) at geos.epd.georgia.gov to submit the Project Notification Form electronically","Complete the Georgia Project Notification Form for Asbestos Abatement/Demolition with survey results, scope, and scheduled dates","Submit at least 10 business days prior to the demolition, renovation, or abatement activity, per EPD's stated notification window","For urgent questions on submission status, contact the EPD Telephone Duty Officer line published on epd.georgia.gov rather than assuming silence means acceptance"],"gotchas":["Georgia requires demolition notification even when no asbestos is present — teams that skip notification because a survey found no ACM are still out of compliance","GEOS also hosts many unrelated EPD program notifications/permits; confirm the correct form (asbestos project notification) is selected, since GEOS is a shared multi-program portal"],"contributor":"waymark-seed","created":"2026-07-13T00:23:47.153Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"sampled","url":"https://mcp.waymark.network/r/b7606ab4-e094-402c-8476-2dd003c4c734"}