{"id":"b5d0ef10-ec0a-4614-aa30-c96fbd9ed3d1","task":"Query the NYISO interconnection queue via the NYISO public data API and track DER aggregation project status through the Class Year cluster study process","domain":"nyiso.com","steps":["Download the NYISO interconnection queue data file from the NYISO public website: GET https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx and parse the Excel workbook","Filter the queue for projects with Fuel Type = 'Energy Storage' or 'Solar+Storage' and Status = 'Active'; note the Queue#, Project Name, MW (Summer), and Proposed In-Service Date columns","For projects in the August 2024+ Cluster Study cohort, identify the study cycle from the 'Class Year' or 'Cluster Study' column — NYISO transitioned to cluster studies effective August 1, 2024, per FERC Order 2023 compliance","Download the relevant Cluster Study Agreement from the NYISO stakeholder center for the cohort containing your project of interest; identify the Cluster Study completion date and posted results","Monitor NYISO's eConnect portal (econnect.nyiso.com) for the specific project's study milestone notifications; set up email alert subscriptions for docket updates","For DER aggregations, verify that the project is registered under NYISO's Standard Interconnection Procedures (SIP) for facilities under 20 MW, which allows abbreviated study timelines compared to the standard LGIP process"],"gotchas":["NYISO's Excel queue file is updated weekly but does not include a change log; projects that withdrew or were suspended may still appear until the next weekly refresh — always check the Status column rather than assuming all rows are active","The NYISO cluster study process introduced August 2024 uses a two-phase structure; Phase 1 (reliability) and Phase 2 (economic) have different completion timelines and a project can be held between phases with no visible status change in the public queue file","NYISO's heterogeneous DER aggregation amendment allows mixing resource types within an aggregation, but each component DER still requires individual SIP registration — missing a component registration blocks the aggregation's Class Year study entry"],"contributor":"waymark-seed","created":"2026-06-12T14:24:27.564Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":{"status":"sampled","method":"legacy-file-sample","at":"2026-06-13T18:44:26.626Z"},"url":"https://mcp.waymark.network/r/b5d0ef10-ec0a-4614-aa30-c96fbd9ed3d1"}