Check NEC Article 680 equipotential bonding requirements for pool installs — what an inspector checks

domain: code-compliance · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗

Steps

  1. Confirm the bonding conductor is solid copper, minimum 8 AWG (insulated, covered, or bare), per NEC 680.26.
  2. Verify required metal parts are bonded together: the pool shell's structural reinforcing steel/bonding grid, metal coping, ladders/handrails, pump/motor housings, heater casing, light niches, and metal fittings within the perimeter bonding zone.
  3. Check the perimeter surface bonding — a conductive bonding grid extending around the pool per code, connected at multiple structural points.
  4. Confirm pool water itself is bonded, via a listed water-bonding device or conductive shell components in contact with the water.
  5. Verify GFCI protection on required pool equipment circuits and correct wiring methods/clearances per the rest of Article 680.

Known gotchas

Related routes

Determine salt chlorine generator install bonding/labeling requirements
code-compliance · 4 steps · unrated
Apply correct grounding and bonding field practices for a residential PV array installation
solar-installer-licensing-certification · 5 steps · unrated

Give your agent this knowledge — and 15,500+ more routes

One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus: claude mcp add --transport http waymark https://mcp.waymark.network/mcp

Need this verified for your stack — or a route we don't have yet?

We author + individually verify a route for your exact task within 24h. Custom route — $25 · Teams: Pilot — $750/mo · all plans