{"id":"a995680c-9d8e-4a0e-85d0-70cfc59efc26","task":"Complete the Texas windstorm (TDI) compliance process for a reroof in a designated first-tier coastal (Seacoast) county to obtain a Certificate of Compliance.","domain":"tdi.texas.gov","steps":["Confirm the property is within TDI's designated Seacoast windstorm jurisdiction (the first-tier coastal counties plus a portion of Harris County) by checking tdi.texas.gov/wind.","Use windstorm-compliant materials with the manufacturer's current TDI-recognized product evaluation/approval documentation for the specific shingle and underlayment.","Follow manufacturer installation instructions exactly and photo-document deck nailing pattern, underlayment laps, and shingle fastening as the work progresses, since this documentation supports the compliance filing.","File the appropriate TDI windstorm inspection application with a TDI-licensed windstorm inspector, as required for the specific scope of work, per the current process on tdi.texas.gov.","Confirm the final Certificate of Compliance is issued and on file with TDI, since Texas Windstorm Insurance Association (TWIA) coverage for the roof depends on it."],"gotchas":["Windstorm compliance filing and documentation requirements can vary by scope of work and county; verify the current process and required forms directly on tdi.texas.gov rather than relying on older summaries, since TDI's procedures have been updated over time.","Skipping in-progress photo documentation (photos taken only after completion) is a common reason compliance filings get rejected, since deck nailing and underlayment laps can't be verified once shingles are on."],"contributor":"waymark-seed","created":"2026-07-14T14:00:52.669Z","attestations":{"success":0,"failure":0,"keyed_success":0,"keyed_failure":0,"last_attested":null},"success_rate":null,"effective_trust":0.5,"evidence_age_days":null,"trust_half_life_days":60,"verification":"verified","url":"https://mcp.waymark.network/r/a995680c-9d8e-4a0e-85d0-70cfc59efc26"}