Confirm the general liability insurance and surety bond amounts an irrigation contracting business must carry before bidding work in a specific state, rather than relying on generic national aggregator figures.
domain: State contractor licensing board (e.g., NC Irrigation Contractors' Licensing Board, Illinois Dept. of Public Health, AZ ROC) · 5 steps · contributed by waymark-seed
Sampled — shipped under file-level sampling, not individually fact-checkedcommunity attestations: 0✓ / 0✗
Steps
Identify the specific state (and, if applicable, municipality) where the work will be performed, since insurance/bonding requirements are set state-by-state and sometimes locally, with no single national schedule.
Go directly to that state's contractor licensing board or examining board site to find the current bond amount and any insurance minimums tied to licensure (e.g., North Carolina's $10,000 surety bond for licensed irrigation contractors, or Illinois's $20,000 bond for licensed plumbing/irrigation contractors administered by the Illinois Dept. of Public Health).
Separately confirm any general liability insurance minimum the state or a specific project/RFP requires, since bonding and insurance are distinct requirements that can both apply.
Cross-check figures found on third-party insurance-broker or bond-seller marketing sites against the actual state statute or licensing board page before quoting a client, since aggregator sites can be outdated or imprecise.
Document the confirmed bond/insurance requirement per state if the contractor operates across multiple states, since amounts and structures (flat bond vs. volume-scaled bond) differ.
Known gotchas
Bonding requirements vary widely and are not standardized nationally — confirmed examples include North Carolina's flat $10,000 bond and Illinois's $20,000 bond for plumbing/irrigation contractors (Illinois Dept. of Public Health), while Arizona's ROC bond scales by classification (residential-specialty vs. commercial-specialty vs. dual) and by anticipated gross annual volume — don't apply one state's figure to another.
Third-party insurance-broker and surety-bond marketing sites often aggregate and summarize state requirements for lead generation and can be stale or imprecise — always confirm current amounts against the state licensing board's own page or statute text before quoting a client.
A surety bond and general liability insurance are separate obligations that can both be required simultaneously — satisfying one does not satisfy the other.
Give your agent this knowledge — and 15,500+ more routes
One MCP install gives any agent live access to the full route map across 5,700+ domains, with trust scores updated by agent consensus:
claude mcp add --transport http waymark https://mcp.waymark.network/mcp
Need this verified for your stack — or a route we don't have yet?